Jeremy Davis

Jeremy Davis

Industrial Maintenance • Millwright • Automation • Fabrication

About

Industrial maintenance professional with extensive experience in high-volume industrial manufacturing factories, utilities environments, and heavy industrial systems. Currently employed at Owens-Illinois (USW).

Millwright foreman in charge of large scale industrial projects nationwide, trusted by plant, corporate, and project management teams to execute complex installations under strict safety, schedule, and performance requirements.

Jeremy Davis TIG welding caricature

Major Industrial Projects

Tesla – Fremont, California Manufacturing Facility

As a millwright foreman, I led large crews in fast-paced, high-demand manufacturing environments where installation schedules, safety requirements, and system performance were non-negotiable.

Orchestrated, executed, and controlled complex mechanical installations inside active production spaces while coordinating with engineering, automation, and multiple trades. Coordinated mechanical installations for high-volume production lines under aggressive 24/7 timelines.

Heavy industrial equipment installation, conveyor systems, structural supports, and integrated mechanical assemblies. Work was performed alongside live systems, requiring disciplined execution, adaptability, and constant situational awareness.

Tesla project installation Tesla production equipment Tesla safety guarding Tesla mechanical assembly

Coca-Cola – Downey, California

Over a two-year period at the Coca-Cola Downey facility, I served as millwright foreman for the demolition and complete installation of two high-volume bottle lines while supporting continuous plant operations through phased shutdowns and system transitions.

Projects included interior clean-room bottle line construction, laboratory build-outs, conveyor and equipment installation, railroad car safety inspection platforms, and electric forklift charging infrastructure.

Fabricated and installed purge-welded stainless steel pipe and sanitary tubing for beverage production systems, including fillers, product transfer, and CIP loops.

Coca-Cola sanitary welding Coca-Cola clean-room fillers Coca-Cola bottle line reconstruction Coca-Cola safety platforms

Pepsi – Blue Ash, Ohio Expansion

Millwright foreman for major plant expansion work supporting high-volume beverage production.

Scope included blow-mold equipment installation, glycol and process piping, structural platforms, safety guarding, and material handling systems coordinated within an active facility.

Pepsi blow-mold installation Pepsi structural platforms Pepsi process piping Pepsi facility expansion

Owens-Illinois (USW) – Industrial Maintenance

Skills & Technology

Education & Training

Contact Jeremy Davis